Data centres & AI infrastructure

Lower the cost of grid-powered computing with digitally reserved solar.

Data centres can continue relying on the grid while reserving solar capacity from CloudEnergy’s remotely located plants. The allocated solar-energy benefit can reduce electricity costs without requiring large onsite installations.

The cost challenge

Continuous grid power is reliable—but expensive

Data centres consume electricity around the clock and generally depend on the grid for operational reliability. Their challenge is the cost of that continuous consumption and the difficulty of installing enough solar at each facility to offset it.

01

High grid expenditure

Large 24/7 compute loads create substantial monthly electricity costs and long-term tariff exposure.

02

Limited onsite space

Rooftops and nearby land are rarely sufficient to install solar capacity matching total data-centre demand.

03

Location constraints

Solar performance and available land at the facility may be weaker than at optimally located remote plants.

04

Renewable targets

Operators need measurable solar allocation and cost benefits while keeping their existing grid connection.

CloudEnergy architecture

Remote solar capacity, digitally allocated alongside grid supply.

01

Hybrid generation

Solar, wind and complementary assets can be developed or aggregated across strong-resource locations.

02

Battery storage

BESS can optimise the availability and value of solar generation without being presented as a replacement for the data centre’s grid supply.

03

Intelligent EMS

Forecasting measures generation, storage activity and each customer’s contracted digital allocation.

04

Capacity reservation

Data centres digitally reserve defined solar capacity or annual generated units from remotely located plants.

Commercial direction

Reserve solar around the compute and cost roadmap.

CloudEnergy can evaluate grid consumption, annual energy requirements, current tariff and growth phases—then size a remote solar reservation designed to reduce energy expenditure while the facility remains grid connected.

ILLUSTRATIVE STRUCTURE
Data-centre grid demand 20 MW
Digitally reserved solar Defined allocation
Existing supply Grid remains primary
Contract Long-term reservation
Illustrative only. Final allocation and savings depend on consumption, tariff, solar generation, regulation and contractual settlement.

Want to reduce data-centre electricity costs?

Share your grid bill and demand →